Which scaffolds need PE design?
Tall, heavily loaded, cantilevered and suspended scaffolds, e.g. metal scaffolds over 30 m
Key points
- Metal scaffolds over 30 m (or 15 m in shipyards)
- More than 2 persons or 25 kg per bay; max 8 persons and 220 kgf/m² on metal scaffolds
- Cantilever-supported scaffolds and suspended scaffold outriggers
- Hanging scaffolds with falls over 2 m; trestles over 3 tiers or 4.5 m
- Build to drawings; re-design before material changes
| Metal (general) | PE over 30 m |
| Metal (shipyard) | PE over 15 m |
| Trestle | Over 3 tiers or 4.5 m |
| Platform load limit | 220 kgf/m² |
Related questions
More in this topic
A plain-language summary for reference only; the official text prevails. For your own case, check with MOM or a professional.