Must building plans include lightning protection drawings?
From 1 Apr 2026, where it applies, lightning protection plans are required and must be drawn by an electrical engineer
Key points
- The 2026 amendment, other than regulations 7, 8, 9 and 11, takes effect on 1 Apr 2026. The lightning-plan rules are in that group
- Where applicable, plan submissions must include lightning protection system plans
- The plans state the class of system and show the air termination, down conductors, the storey of the earth electrodes, and the equipotential bonding points
- A registered electrical professional engineer prepares and signs them, and certifies that they follow the Regulations
- Like-for-like replacement or repair of an existing system is an insignificant building work, unless it sits on a site with other works that still need approval